Minesite Workshop Safety

Minesite Workshop Safety

Brockman 1 MEM Workshop   Demarcated Pedestrian Walkways & Workshop Superior Protective Safety Flooring     Project: The new Brockman 1 state-of-the-art MEM Workshop, office and warehouse building required epoxy resin high build coating to withstand...
Car Park Ramp

Car Park Ramp

SwanCare Waminda Facility   Slip Resistant Surfacing System Low Maintenance   Project: Drivers using the car park ramp at the SwanCare’s Waminda facility in Belmont were experiencing serious safety issues with the driveway, particularly in wet weather. The...
Mooka Ore Car Repair Workshop

Mooka Ore Car Repair Workshop

Demarcated Pedestrian Walkways     Project: The new Mooka state-of-the-art ore-car repair shop, office and warehouse building required epoxy resin high build coating to withstand extreme heavy duty from the 10 tonne AGV (Automated Guiding Vehicles) traffic. A...
Perth Train Station

Perth Train Station

Upper Level Concourse   Rapid Installation Decorative Finish   Project: The original floor tiles to the City of Perth train station on the upper level concourse were found to be continuously cracking and moving, and with 60,000 commuters using the concourse...
Gage Roads Brewery

Gage Roads Brewery

Chemical and UV Resistant Bunded Area Slip and Impact Resistant Surfacing System     Project Brief   Gage Roads wanted to expand their operations so needed to create an external bunded concrete area for the location of beer and additive silos. The area...